Location: No. 1 Huixian Park, Southern High-Tech Zone, Dalian
Located in the Southern High-Tech Zone of Dalian near the coast, the Dalian Tengfei Software Park project provides dedicated parking infrastructure for the campus. Across multiple phases, Dayang has installed two-story, three-story, five-story, and six-story lifting and sliding automated parking systems at the site, delivering a cumulative total of 866 parking spaces.
With successive phases of automated parking equipment put into service, parking capacity across the park has expanded substantially to meet daily demand. The systems utilize hydraulic lifting technology designed for smooth operation, dependable performance, strong safety margins, and convenient vehicle entry and retrieval, earning positive feedback from park management and employees.
Most recently, two-level and three-level lifting and sliding parking equipment—comprising 19 sections and 253 parking spaces—was constructed beneath Buildings 10, 11, and 12. Supported by dedicated on-site scheduling and overtime work from the project manager and installation crew under strict company quality standards, installation is essentially complete and preparing for handover and operation.
During comprehensive acceptance inspection, the installation met high workmanship standards with minimal punch-list items. Field engineers and the project manager worked closely on-site throughout testing and inspection to refine equipment details and support overall quality.
Guided by consistent standards across product quality, sales coordination, service delivery, and project execution, our team remains focused on resolving site issues thoroughly and delivering reliable automated parking solutions for campus users.
| |
| |