The main campus of Chaoyang Central Hospital in Liaoning Province is located at No. 6, Section 2, Chaoyang Street, Chaoyang City, Liaoning Province. The Yanbei Campus is located at No. 278, Section 1, Chaoyang Street, Shuangta District, Chaoyang City, Liaoning Province. It covers an area of 78,138 square meters, with a building area of 147,370 square meters. The total value of fixed assets is approximately 1.237 billion yuan. It plays an important role in the city's clinical and scientific research fields.
The hospital is a Grade 3A hospital in Chaoyang City. Every day, thousands of vehicles enter and exit the hospital, but the surface parking spaces reserved by the hospital cannot meet the parking needs of thousands of vehicles. Vehicles were unable to park properly, blocking roads and hindering the movement of citizens coming to the hospital for medical treatment, which posed a significant safety hazard. Therefore, the parking issue has become a pressing problem that the hospital and the public urgently need to resolve. Building a multi-story parking garage within the limited space is the best way to solve the parking problem.
Our company's parking equipment is designed to be safe and reliable, easy to use, and complies with the requirements of the transportation, fire protection, environmental protection, and quality and technical supervision departments of Chaoyang City. Based on the actual conditions of the site, our company's technical personnel have designed a six-level lifting and sliding automated parking garage solution that meets the requirements of the infrastructure site and vehicle entry and exit, with the maximum vehicle capacity specifications and number of spaces. The final decision was to build a six-story hydraulic lifting and sliding parking garage with 216 parking spaces.
The project was completed in May 2022 and officially put into operation in June. It has been in operation for over a year now. It operates smoothly with low noise and a low failure rate. It has greatly alleviated the problem of difficult parking on the hospital campus.
The equipment operates at full capacity every day, with a high vehicle entry and exit rate. Professional security personnel are assigned daily to guide vehicles in and out. High-frequency operation and low failure rate have earned unanimous praise from the hospital and local residents.
The Chaoyang City Hospital Automated Parking System Project is the first automated parking system project in Chaoyang. The completion and operation of this project have solved the hospital's parking dilemma, effectively alleviating the issue of parking difficulties for patients seeking medical care. It has also eased traffic congestion on Chaoyang Street and improved the overall surrounding environment, creating a clean, convenient, and stable public parking environment for hospital staff and citizens visiting for medical treatment.